What each system does, what it costs, and when the county makes you buy the expensive one.
Tank, then gravity carries clarified liquid to gravel trenches where soil finishes treatment. No pumps, no electricity, simplest maintenance. Requires good-percolating soil, adequate lot size, and a water table that stays well below the field. If your lot qualifies, this is what you want.
Same idea, but manufactured plastic chambers replace gravel trenches. Less gravel to haul, faster install, easier inspection. Common where gravel is scarce or expensive. Maintenance is the same as conventional.
When the water table is high or soil is too shallow, an engineered sand mound is built above grade and effluent is pumped up into it. Needs a pump chamber, electrical, and engineered design. Pumps and controls add ongoing maintenance and replacement costs.
An aerator actively treats wastewater in the tank before it reaches a (usually smaller) drain field. Fits small lots and marginal soils, and many states require them near waterways. Tradeoffs: continuous electricity, required service contracts (typically 1–2 visits/year), and more parts to fail. Bad sites push engineered ATU projects past $40,000.
Pressurized pump pushes effluent through drip tubing buried shallow across a large area. Good for slow soils and landscaped sites. Complex sites reach $35,000+. Drip lines need flushing and monitoring; not a set-and-forget system.
The site evaluation and your county's rules choose for you. Your real decision is the installer: get three quotes from licensed installers, ask each what system type they're proposing and why, and compare their answers. If two say conventional and one says mound, ask the third what they see that the others don't.
Install price is the number in the table above, but the systems separate further once a decade of ownership is counted. A conventional gravity system has almost no running cost: no electricity, no service contract, and a pumping visit every three to five years at roughly $300 to $600 each, so a decade of ownership adds perhaps $1,000 to $2,000 to the install price. A chamber system tracks nearly the same, since it is the same treatment idea with different hardware in the trench. A mound system adds a pump that runs daily, a pump replacement roughly once a decade at $800 to $2,000 installed, and periodic inspection of the dosing controls. An aerobic unit carries the heaviest running costs of the common types: continuous electricity for the aerator, a service contract at a few hundred dollars a year in most jurisdictions that require one, and more mechanical parts with service lives well under the tank’s. Budget roughly $3,000 to $5,000 of extra ten-year cost for an ATU over a conventional system on the same lot. Drip systems sit between mound and aerobic: pump energy, filter cleaning, and line flushing are recurring jobs, and neglected drip fields are expensive to rehabilitate. None of this makes the advanced systems bad choices; on lots where they are required, they are the only choices. It does mean a quote comparison that stops at install price is missing a third of the real cost.
When a site evaluator digs test pits and runs a percolation test, they are answering three questions that pick the system type. How fast does the soil absorb water? Soil that percolates too slowly cannot take a conventional field at grade, and soil that percolates too fast may not treat effluent before it reaches groundwater, which pushes toward an engineered or aerobic design. How deep is the seasonal high water table and any bedrock? Counties typically require a set separation, often two to three feet, between the bottom of the drain field and groundwater or rock; a shallow water table is the single most common reason a mound is required. How much usable area does the lot have, including the reserve area many counties require for a future replacement field? Small or steep lots with little compliant area are where chamber, drip, and compact aerobic designs earn their keep. Ask your evaluator to show you the pit logs and the perc numbers, not just the conclusion. Those documents explain the quote, they stay with the property records, and they are what a second installer will ask for first.
Ask which system type is being proposed and what in the site evaluation requires it, and write the answer into the contract. Ask whether the price includes the permit, the engineered design if one is needed, electrical work for pumps or aerators, and restoration of the yard afterward, because each of those has arrived as a surprise extra on real projects. Ask what the maintenance obligations are in writing, including any county-required service contract and what it costs per year, so the running cost is known before the system is in the ground. Ask how long the installer has been licensed in your county and whether they will be the ones to service the system, since an installer who also services tends to design for serviceability. Finally, ask what happens if the crew opens the ground and finds conditions different from the test pits: who pays for the change, and how is it approved? Getting that answer before excavation is the difference between a change order and an argument.